Toondah Ferry Terminal Environmental Impact Statement.
Results 1 to 2 of 2

Thread: Toondah Ferry Terminal Environmental Impact Statement.

  1. #1
    Ausfish Bronze Member


    My Classifieds Feedback

    (0% Positive Feedback)

    Toondah Ferry Terminal Environmental Impact Statement.

    Toondah Ferry Terminal Environmental Impact Statement.
    Highlights:
    The Project will result in the direct loss of marine and wetland habitat within the reclamation and dredging footprint including: 3.4 ha of mangroves; 37 ha of seagrass, including 11.8 ha in the Fison channel extension; and 8.8 ha of unvegetated sand/mud.
    The existing trailer boat ramp will be removed and replaced by a facility for non-motorised vessels.
    Link to summary
    Executive Summary.pdf (caapp.com.au)

  2. #2
    Ausfish Platinum Member


    My Classifieds Feedback

    (0% Positive Feedback)

    Re: Toondah Ferry Terminal Environmental Impact Statement.

    Quote Originally Posted by Bobpen View Post
    Toondah Ferry Terminal Environmental Impact Statement.
    Highlights:
    The Project will result in the direct loss of marine and wetland habitat within the reclamation and dredging footprint including: 3.4 ha of mangroves; 37 ha of seagrass, including 11.8 ha in the Fison channel extension; and 8.8 ha of unvegetated sand/mud.
    The existing trailer boat ramp will be removed and replaced by a facility for non-motorised vessels.
    Link to summary
    Executive Summary.pdf (caapp.com.au)
    Gee 37ha of seagrass is a lot of seafood habitat gone for ever.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •