What else is there to do after weeks of wind and rain postponing work, no fishing and too much time to think.....renovations of course ;D
First job was to decipher this mess....identify, tag and disconnect almost every one to reposition gauges and switches (and hope like hell they all go back together)
89631
Meanwhile my pride and joy has been looking like this
89630
But there is some light at the end of the tunnel, now looking like this
89629
Replaced the dash panel and re-organise to fit Raymarine, ICOM VHF and also keep the existing gauges. HDS12 on top.
Switch panel moved from original dash to console face
New fuse panel for the additional toys
New isolation switch ( strangely the boat didn't have one )
Full wiring and breaker for the MinnKota (24v)
Plumbing and pre-wire for deck wash
What's left to complete....
Fit deck wash
Install battery bank and 24v charger
Mount leccy
CLEAN UP!!!!
Possibly finished tomorrow.........I wanna go fishing:P
G
First job was to decipher this mess....identify, tag and disconnect almost every one to reposition gauges and switches (and hope like hell they all go back together)
89631
Meanwhile my pride and joy has been looking like this
89630
But there is some light at the end of the tunnel, now looking like this
89629
Replaced the dash panel and re-organise to fit Raymarine, ICOM VHF and also keep the existing gauges. HDS12 on top.
Switch panel moved from original dash to console face
New fuse panel for the additional toys
New isolation switch ( strangely the boat didn't have one )
Full wiring and breaker for the MinnKota (24v)
Plumbing and pre-wire for deck wash
What's left to complete....
Fit deck wash
Install battery bank and 24v charger
Mount leccy
CLEAN UP!!!!
Possibly finished tomorrow.........I wanna go fishing:P